EuroSite Power is hosting a special event to provide a live case study of its On-Site Utility™ solutions at the world famous Wentworth Club, Surrey, UK on 24 September 2015 from 11 am to 2 pm. The event will provide an opportunity for delegates to learn how an On-Site Utility™ solution provides immediate, risk free savings with zero capital investment or maintenance costs for the customer.
With its On-Site Utility™ solutions, EuroSite Power sells the energy produced from an onsite energy system to an individual property as an alternative to the outright sale of energy equipment. On-Site Utility™ solution customers only pay for the energy produced by the system and receive a guaranteed discount rate on the price of the energy.
EuroSite Power has provided two On-Site Utility™ solutions to Wentworth Club, which will be used as a case study at the event. A 100 kW combined heat and power (CHP) system at the Tennis & Health Club produces approximately 753,750 kWh of total energy per annum, while saving up to 135 tonnes of CO2, each year. A second system at the Clubhouse, produces up to 100 kWe of power or approximately 1,304,500 kWh of total energy per annum, while saving up to 240 tonnes of CO2, each year.
All system capital, installation, operating expenses and support are paid by EuroSite Power so Wentworth Club only pays for the energy it uses at a guaranteed lower cost than if it were to buy directly from the grid.
To enquire about a place at the event go to www.eurositepower.co.uk/book-conference.php.